KGC-208 3-Phase Monitoring
The KGC-208 is factory pre-set as follows: 5 second
utility loss delay before starting the generator, 15
second delay before transferring after generator
voltage is detected and a 2 minute delay before
switching back to utility after power is restored. The
generator ON contacts will open 10 seconds after the
power transfers back to utility.